Construction plan for exterior wall glass curtain wall
2024-06-05 Back
Construction Scheme of Exterior Glass Curtain Wall
1. Design Stage
Determine the curtain wall design scheme, including structural type, glass type, aluminum profiles, etc.
After structural calculations and architectural design refinement, complete the design of construction drawings.
2. Material Preparation
Ensure sufficient preparation of required materials, including glass, aluminum profiles, sealing adhesive, etc.
Inspect the materials to ensure that the quality meets the requirements.
3. Pre-construction Preparation
Determine the construction site, implement safety protection, and delineate the construction area.
Prepare the necessary construction equipment and tools.
4. Installation of Glass Curtain Wall
According to the design drawings and technical requirements, install aluminum alloy profiles, glass components, etc.
Install and secure the glass according to the design drawings to ensure structural stability.
5. Sealing Treatment
Use professional sealing adhesive to seal the curtain wall structure to ensure its waterproofing, thermal insulation, and heat insulation performance.
6. Acceptance and Maintenance
After completion of the construction, conduct acceptance of the curtain wall to ensure compliance with design requirements.
Provide a maintenance plan for the curtain wall, guiding the owner on how to perform daily maintenance to extend the lifespan of the curtain wall.
This is just a general outline of the construction scheme for an exterior glass curtain wall. The specific construction plan may vary depending on the project's specific circumstances, such as building structure, glass area, design requirements, etc. During the actual construction process, it is recommended to collaborate with a professional curtain wall company or construction team to ensure construction quality and project progress.